Important height warningBecause the product is secured solely by a cured construction-sealant bond, Apeiron Guard does not recommend installation at a height of 3 m or above. Installation at this height may proceed only after a competent installer has completed and documented a full site-specific assessment of the mounting location, substrate condition, environmental exposure, falling-object risk and bonding suitability, and has determined that the product can be installed safely and securely. The installer remains responsible for the installation method and for compliance with all applicable work-at-height and safety requirements.
Do
- Test the radio event at the proposed position before permanent mounting.
- Metal, timber, masonry, composite and other fence materials may be used when the surface is stable, structurally sound, clean and compatible with the structural sealant.
- Use a fence cap or rail at least 50 mm wide to provide a stable installation surface.
- Inspect coatings and surface layers for peeling, flaking, delamination or other loss of adhesion before installation.
- Keep the activation area unobstructed.
- Verify repeated operation before handing over the system.
- Follow the substrate and sealant manufacturers’ preparation, application and curing guidance.
Do not
- Do not install on a surface that is peeling, flaking, loose, delaminating, unstable or likely to detach from the underlying structure.
- Do not bridge or block drainage gaps or movement joints.
- Do not assume installation is possible at corners, posts, rail joints or uneven fence sections; assess each condition onsite and proceed only where a safe, stable installation is achievable.
- Do not drill into, open, paint or modify the enclosure.
- Do not reuse removed sealant or substitute an unapproved bonding system.
- Do not rely on the maximum radio range without an on-site test.